The largest master-planned community in OC — built in the 1970s-80s with pipes that were never designed to last this long. HOAs, apartments, and commercial buildings face cascading failures. LoMonaco Coast rehabilitates from the inside. NuFlow CIPP. 50+ year lifespan.
1970s lakefront homes. Original cast iron and copper at 50+ years. Root intrusion rampant.
1980s residential. Large HOA communities with shared sewer lines hitting failure.
Mall-adjacent commercial. Restaurants, retail with aging grease and waste lines.
55+ active adult community. 1970s pipes. Minimizing disruption critical for residents.
1980s residential and school district infrastructure. Mature trees = root intrusion.
Also serving: Alicia Parkway corridor, Marguerite Parkway, La Paz Road, Olympiad Heights, Pavion, Mission Hills, Deane Homes, Melinda Heights, Pacific Hills
See how we rehabilitate pipes across Mission Viejo's communities — no excavation, no demolition. A new pipe inside your old one, built to last 50+ years.
Line pipes without closing rooms. Zero guest disruption. Done overnight.
Grease-damaged drain lines rehabilitated. No kitchen shutdowns. Health code compliant.
Vertical risers and laterals lined floor-by-floor. Tenants stay in place.
Multi-unit buildings with shared waste lines. Line entire stacks without relocating residents.
Shopping centers, strip malls, warehouses. Keep businesses open during rehabilitation.
See how much your facility saves with trenchless CIPP lining vs. conventional excavation.
HD camera survey maps your entire pipe system. We identify every crack, root, offset, and defect. Full video report included.
High-pressure water (up to 4,000 PSI) clears roots, grease, scale, and debris. Pipes are prepped clean for the liner.
NuFlow epoxy-saturated liner is pulled into place inside the existing pipe. UV or ambient cure creates a new pipe-within-a-pipe. No digging.
Post-cure camera inspection verifies 100% coverage. You get a video of the finished liner plus a 50+ year warranty.
1976 condo complex near Lake Mission Viejo. Cast iron risers corroded through. Lined all stacks and laterals — zero relocations, HOA avoided $200K+ in dig costs.
1984 apartment building with multiple emergency backups in 6 months. Full camera survey revealed system-wide corrosion. Lined entire building in 5 days.
Whether you manage an HOA at the lake, a senior community in Casta del Sol, or a commercial property on Marguerite — we're ready — we're ready. Family owned, locally operated, and backed by 12+ years of Orange County experience.
Fill out the form and we'll get back to you within 2 hours — usually faster.